Referenz
Reinforcing steel
A total of 550 tonnes of reinforcing steel was delivered.
Rietheim-Weilheim
As part of the plant expansion for WERMA Signaltechnik GmbH + Co. KG, SÜLZLE Stahlpartner Rosenfeld will supply a total of 550 tonnes of steel and 90 tonnes of steel mesh in 2025/2026 on behalf of Decker GmbH & Co. KG.
Plant 2 in Rietheim-Weilheim is set to become a future-oriented production and logistics site, creating additional capacity, state-of-the-art infrastructure and space for technological development. The first of three construction phases involves an expansion of 5,000 m² and increases production capacity by approximately 50%. Highlights include a state-of-the-art fire-extinguishing system with a large water tank, a reorganised logistics area with optimised material flow, and a fire-resistant connecting structure between Plants 1 and 2.
WERMA sets global standards in modern signalling technology and offers solutions that make working environments safer and more efficient. The new building is expected to be ready for occupancy in mid-2027.
Products and Services
Further references
