Oetmannshausen

Tunnel Trimberg

The traditional tunnel tapping ceremony for the Trimberg Tunnel near Wehretal-Oetmannshausen took place on 16 May with the start of tunnelling work. By next summer, space is to be created for the tubes that will form part of the A44 motorway. The Trimberg Tunnel consists of two parallel tunnel tubes, which are connected at two points with cross-passages as escape routes.

The tunnel is 600 metres long, 440 metres of which will be constructed using the mining method. Between January 2017 and June 2019, SÜLZLE Stahlpartner supplied around 3,200 tonnes of reinforcing steel for the open construction method of this project on behalf of ARGE Tunnel Trimberg.

Products and services

Here you will find the achievements and installed products.

Location of the reference project “Trimberg Tunnel”:

Tunnel Trimmberg

37287 Wehretal

You are currently seeing a placeholder content of Google Maps. To access the actual content, click on the button below. Please note that data will be passed on to third-party providers. By loading the map, you accept the privacy policy of this website and of Google.

Privacy policy Google Privacy policy SÜLZLE Stahlpartner

SÜLZLE Stahlpartner Branch Nordhausen:

SÜLZLE Stahlpartner GmbH
Branch Nordhausen

Südstraße 11

99734 Nordhausen
Germany

Tel. +49 7428 9414 – 0
Fax +49 7428 9414 – 20
Mail info@suelzle-stahlpartner.de

Thorsten Hille

Branch Manager

Tel. +49 3490 1507 – 16
Fax +49 3490 1507 – 20
Mail thorsten.hille@suelzle-stahlpartner.de

Thorsten Hille, Bereichsleiter für die Standorte Dessau-Roßlau, Nordhausen und Seelze